Pre-REAC & Post-REAC Services

Pre-REAC & Post-REAC Services

REAC Property Consultants, LLC provides a variety of Pre-REAC and Post-REAC services. All of our services come with a 100% money-back satisfaction guarantee that you will pass the next REAC inspection if you simply remediate the deficient items we identify during our inspection. We will match any competitor's offer.

REAC Inspector Escort

To ensure that REAC Inspections are conducted according to the REAC Protocol and regulatory guidelines we accompany the REAC Inspector on the actual inspection of your property. Oftentimes, you have less than two weeks to prepare upon notification of an inspection which may not be enough time.

This is an invaluable inspection as, oftentimes, all it takes is an unsecured electrical panel, inoperable auxiliary light, a few doors that do not operate properly, minor soil erosion, or a trip hazard to lose enough points to fail or do poorly on the REAC inspection.

We can come to the site a day or two in advance and help you prepare for the inspection and prepare and accompany you on the inspection. REAC Inspectors tend to be fairer in their assessment and interpretation of the rules when someone who know rules very well is with them.

REAC allows properties to hire a Non-Certified Inspector to accompany the Certified REAC Inspection during a REAC Inspection per the REAC Inspector Notice No. 2015-02.

REAC Property Consultants, LLC
REAC Property Consultants, LLC

REAC 100% Inspection

In the Pre-REAC 100% inspection we inspect 100% buildings and 100% of the units, as well as the grounds including roads, parking, playground equipment, fences and all the other items that REAC inspects during an inspection.

Our computer report lists all of the deficiencies, including photos, for each building and unit, as well as for the site (grounds), and includes a score for each defect as well as an overall REAC Score.

Sample Pre-REAC Inspection

  • The Pre-REAC inspection involves inspecting all of the same items that are inspected by HUD REAC prior to the actual HUD inspection.
  • It follows the same inspection protocol as REAC does and includes inspecting the same number of sample units.
  • The grounds, roads, parking, playground equipment, fences, fences, common areas, and all the other items that REAC inspects during an inspection are included.
  • Our report lists all the deficiencies for each building and unit, as well as for the site (grounds). Reports are issued within 24 hours of the inspection.
  • These inspections are conducted in advance of a HUD REAC inspection, generally no later than three weeks beforehand.
  • The Pre-REAC inspection involves identifying those high point deduction items that can be repaired quickly and prioritizes other deficiencies.
  • The Pre-REAC inspection focuses on the items you have the most control over; those items outside the units.